Saturday, August 6, 2011

Friday August 5

The treatment room floor has been removed, the ExacTrac boxes cut out of the floor, and the raceway and conduits removed from the back wall.

The sheetrock was removed from the console vault wall, and new electrical conduits and connections are being installed.

The main waiting room is prepped for painting.

The window and door frames for the new nurses' station are installed.

The front hallway is primed and ready for paint.